In a market where speed to occupancy and build quality determine ROI, phased delivery is no longer optional. It is the way resilient logistics portfolios get built. NovaHub structures the NOVA HUB logistics center to enter the market in clear stages. Each phase has its own completion timeline and defined gross floor area, published for investors and occupiers to evaluate before commitments are made. That transparency shortens decision cycles and supports smarter leasing strategies in a logistics center Ukraine customers can trust.
🚚 Why phased development matters now
Market demand that rewards readiness
Demand is shifting from speculative volume to move-in-ready quality with smart infrastructure and quick commissioning. The rise of e-commerce continues to reshape storage and last-mile needs in Ukraine. As a result, projects that can release Class A space in predictable portions gain traction with operators who plan capacity quarter by quarter.
“Q1 2024 saw a notable increase in leased logistics space driven by e-commerce operators.”
CBRE Ukraine Logistics Market View (2024)
NOVA HUB aligns with that trend. The master plan sequences build-out so pre-lets can match real operational windows. This is especially important for companies that scale by season or by lane, including those routing flows near port Odesa and along the Odesa–Kyiv corridor.
Risk management and tenant fit-outs
“Phased commissioning of logistics hubs reduces vacancy risk and allows tailored tenant fit-out.”
JLL Logistics Development Guidelines (2024)
By commissioning in stages, NovaHub reduces lease-up risk and enables earlier customization of racking, mezzanines, and automation. That approach also tightens CAPEX control and accelerates time to revenue for each tranche of the modern logistics center, without waiting for the entire complex to complete.
🧭 Master plan: how phases and areas are organized
How the phases are structured
The complex is divided into several construction phases. Each phase specifies warehouse blocks, auxiliary yards, and office components with associated utilities. The structure allows logistics operators to lease contiguous modules or scale into adjacent modules in later stages. This is where NovaHub’s balance of reliability, speed, and quality shows. Delivery batches are large enough to matter operationally, yet compact enough to commission quickly.
Where to find exact floor areas and specs
Exact floor areas for every phase are published in the official master plan. You can review the phase-by-phase square meters and spatial configuration here: Master development plan and phase areas. For consolidated technical characteristics, ceiling heights, parking, and service infrastructure, consult the characteristics section: Project characteristics and capacities. These two sources provide the authoritative numbers you need for precise operational planning and investment modeling.
🗓️ Delivery timeline and monitoring
Milestones you can plan around
The delivery timeline is mapped against the overall construction cycle and parallel work streams. You can follow the sequencing and expected commissioning windows by reviewing the public roadmap. This view shows how site works, shell construction, MEP installations, and external improvements run in tandem to keep phase handovers on schedule. See milestone sequencing here: Roadmap with construction phases.
Real-time progress tracking
NovaHub provides a practical, investor-grade tool to track the build. With real-time monitoring, you can see how each phase advances from earthworks through façade, to interior systems and pre-commissioning. This reduces uncertainty for tenants planning inbound inventory and for investors modeling cash flows. Monitor construction here: Monitor construction online. If you need on-the-ground coordination, the contacts page includes map details and communication channels for site visits near port Odesa and along the regional highway: Location and contacts.
📍 Strategic location and investment logic
Why the location near port Odesa compounds value
Siting a logistics complex near port Odesa reduces lead times and intermodal friction for import, export, and cabotage flows. When combined with direct highway access toward Kyiv, NOVA HUB minimizes first- and mid-mile transport variability. Many tenants consider this the decisive factor that turns a promising shed into a preferred node in their network. In practical terms, your inbound containers can reach the park fast, and your replenishment runs can stabilize around predictable transit times.
Built for modern operations, safety, and uptime
The NOVA HUB logistics center integrates office and warehouse space in one complex, enhancing coordination between operational and commercial teams. The project emphasizes European-standard construction quality, autonomous utilities for resilience, and round-the-clock video surveillance for sitewide security. Explore the value stack and site-wide benefits here: Advantages of NOVA HUB. Professional management from the developer side also supports faster handovers and quality assurance across the life of the asset. Learn about governance and operations here: Managing company and developer.
For investors, the staged plan improves absorption and reduces vacancy exposure. For occupiers, the configuration and expansion options mean you can start smaller and grow inside the same park. The result is a modern logistics center that balances reliability with flexibility, and speed with quality.
Operational features at a glance
- Resilience and safety Autonomous water supply and fire-fighting systems. Constant CCTV coverage for 24/7 security.
- Quality and compliance European construction standards, durable materials, and consistent QA that support industry certifications.
- Speed and scalability Phased delivery, predictable commissioning, and modular space planning inside a single logistics campus.
To align fit-out timelines with delivery windows, teams typically follow three steps. First, lock in your preferred phase and module size using the numbers shown in the master plan. Second, confirm infrastructure specifications in the characteristics. Third, track milestone progress via the roadmap and live monitoring so your operations and staffing plans stay synchronized.
🎯 Conclusion
NOVA HUB brings clarity to development, from areas per phase to construction milestones you can verify in real time. That is what investors and logistics operators need most: reliable sequencing, transparent data, and a location that keeps freight flowing near port Odesa and toward Kyiv. If you are comparing options for a modern logistics center in Ukraine, NovaHub combines reliability, European-standard build quality, and commissioning speed that shortens your path to productivity.
Looking for a reason to act now? Our seasonal Black Friday highlights are live across the site. Discover time-limited advantages, emotional value adds, and smart cost-of-entry opportunities tailored to NOVA HUB’s phased plan. Visit NovaHub online to explore the details, compare phases, and secure your position before the holiday rush reshapes availability.
Where can I find the exact floor area of each NOVA HUB phase?
All phase-by-phase square meters are listed in the master plan and characteristics sections referenced in the article. Review the master plan for areas and the characteristics page for technical specs.
How do I track the delivery timeline for my selected phase?
Use two official tools mentioned above: the public roadmap to view milestone sequencing and the live monitoring page to see real-time progress. Align your fit-out schedule as each milestone is completed.
What is the practical advantage of a location near port Odesa for NOVA HUB?
Proximity to the port lowers intermodal friction and shortens inbound transit times. With direct highway access toward Kyiv, this location stabilizes replenishment planning and reduces logistics variability.
How does phased commissioning reduce risk for investors and tenants?
Phased delivery allows earlier occupancy of completed modules and custom fit-outs while later stages are built. This reduces vacancy exposure and aligns space commitments with operational growth.
What steps should my team follow to align fit-out with phase handover?
First, choose your phase and module size using the master plan. Second, confirm specifications in the characteristics section. Third, track milestones via the roadmap and live monitoring to time procurement and staffing.
{
“@context”: “https://schema.org”,
“@type”: “FAQPage”,
“mainEntity”: [
{
“@type”: “Question”,
“name”: “Where can I find the exact floor area of each NOVA HUB phase?”,
“acceptedAnswer”: {
“@type”: “Answer”,
“text”: “All phase-by-phase square meters are listed in the master plan and characteristics sections referenced in the article. Review the master plan for areas and the characteristics page for technical specs.”
}
},
{
“@type”: “Question”,
“name”: “How do I track the delivery timeline for my selected phase?”,
“acceptedAnswer”: {
“@type”: “Answer”,
“text”: “Use two official tools mentioned above: the public roadmap to view milestone sequencing and the live monitoring page to see real-time progress. Align your fit-out schedule as each milestone is completed.”
}
},
{
“@type”: “Question”,
“name”: “What is the practical advantage of a location near port Odesa for NOVA HUB?”,
“acceptedAnswer”: {
“@type”: “Answer”,
“text”: “Proximity to the port lowers intermodal friction and shortens inbound transit times. With direct highway access toward Kyiv, this location stabilizes replenishment planning and reduces logistics variability.”
}
},
{
“@type”: “Question”,
“name”: “How does phased commissioning reduce risk for investors and tenants?”,
“acceptedAnswer”: {
“@type”: “Answer”,
“text”: “Phased delivery allows earlier occupancy of completed modules and custom fit-outs while later stages are built. This reduces vacancy exposure and aligns space commitments with operational growth.”
}
},
{
“@type”: “Question”,
“name”: “What steps should my team follow to align fit-out with phase handover?”,
“acceptedAnswer”: {
“@type”: “Answer”,
“text”: “First, choose your phase and module size using the master plan. Second, confirm specifications in the characteristics section. Third, track milestones via the roadmap and live monitoring to time procurement and staffing.”
}
}
]
}
{
“@context”: “https://schema.org”,
“@type”: “Article”,
“headline”: “NOVA HUB Development Plan: Delivery Timeline and Area by Phase”,
“description”: “See the NOVA HUB logistics center phases, delivery schedule, and areas. Plan fit-outs and monitor construction online with NovaHub’s transparent roadmap.”,
“datePublished”: “2025-11-21T11:52:22.000000Z”,
“author”: {
“@type”: “Organization”,
“name”: “NovaHub”
}
}